AGL Civils Works
|
|
|
|
|
|
New Runway, inset blue edge installation
|
|
|
Project, AGL Works Package
|
|
|
|
|
| |
|
New Taxiway centre Line for BAA's
|
|
|
2nd Runway using Alstom Can system
|
|
| |
|
|
| |
|
New cable duct route for Fibre Optic cable for terminal access
|
|
| |
|
|
| |
|
|
Installation of 100 Diameter cable duct to AGL light fitting
for BAA
|
|
| |
|
|
| |
|
Installation of new Runway approach system for BAA
|
|
|
Installation of pit and duct system for BAA
|
|
| |
|
|
| |
|
New AGL system installed live for BAA
|
|
|
New signage bases installed
|
|
| |
|
|
| |
|
New bases ready for installation
|
|
|
Signage bases ready for signs
|
|
| |
|
|
| |
|
Our new Crafco heater extruder is the largest in Europe, and
the only one in the UK
|
|
|
It's huge output allows us to install 2 - 3000m per night
of overband sealant
|
|
| |
|
|
| |
|
The overband machine has no naked flame and is the safest on
the market.
|
|
| With the extruder being temperature controlled, the sealant
reaches the Runway surface the same as in the tank - 190° |
|
| |
|
|
| |
|
New AGL approach system, installed live
|
|
|
| |
|
|
| |
|
Delethalisation works for Runway edge protection, installing
5000 tons of aggregate on night closers
|
|
|
Exposing existing AGL cables for split cable ducts
|
|
| |
|
|
| |
|
Installing new pit and cable ducts prior to delethalisation
works at intersection
|
|
|
New Runway crossing for AGL cables
|
|
| |
 |
 |
| |
|
|
| |
 |
| |
|
|
|
|