Bar-W-Group
home page airport repairs and maintenance Bar-Build Ltd scottcrete specialist surfacing Bar-W-Contractors contact us contact us
AGL Civils Works
Projects
Overband seal works / Crafco
AGL plant used
Agl civils works
car parks works
saw cutting and core works
line marking and rubber removal
radar and ILS projects
interceptor works
scottish and southern works
grass maintenance
fire training
new runway inset blue edge insatallation
AGL Works Package
New Runway, inset blue edge installation
Project, AGL Works Package
New Taxiway centre Line for BAA's
Alstom Can system
 
New Taxiway centre Line for BAA's
2nd Runway using Alstom Can system
 
cable duct route
terminal access
 
New cable duct route for Fibre Optic cable for terminal access
 
fibre optic
AGL light fitting
 
See above
Installation of 100 Diameter cable duct to AGL light fitting for BAA
 
Installation of new Runway approach system for BAA
nstallation of pit and duct system for BAA
 
Installation of new Runway approach system for BAA
Installation of pit and duct system for BAA
 
New AGL system installed live for BAA
New signage bases installed
 
New AGL system installed live for BAA
New signage bases installed
 
New buses ready for installation
Signage bases ready for signs
 
New bases ready for installation
Signage bases ready for signs
 
Our new Crafco heater extruder is the largest in Europe, and the only one in the UK
It's huge output allows us to install 2 - 3000m per night of overband sealant
 
Our new Crafco heater extruder is the largest in Europe, and the only one in the UK
It's huge output allows us to install 2 - 3000m per night of overband sealant
 
overband machine
extruder being temperature controlled
 
The overband machine has no naked flame and is the safest on the market.
With the extruder being temperature controlled, the sealant reaches the Runway surface the same as in the tank - 190°
 
New AGL approach system, installed live
AGL emergency repairs
 
New AGL approach system, installed live
AGL emergency repairs
 
Delethalisation works for Runway edge protection
Exposing existing AGL cables
 
Delethalisation works for Runway edge protection, installing 5000 tons of aggregate on night closers
Exposing existing AGL cables for split cable ducts
 
New Runway crossing for AGL cables
 
Installing new pit and cable ducts prior to delethalisation works at intersection
New Runway crossing for AGL cables
  new Papi
 
New papi
New papi
  new duct crossings
 
New duct crossings
BAR-W-GROUP  Dalcross Industrial Estate  Inverness Airport  Inverness   IV2 7JB   Scotland
Tel: 0800 085 9031 / 01667 460376  Fax: 01667 460373  email: barwairports@ukonline.co.uk