AGL Plant Used
Projects
Overband Seal works / Crafco
AGL plant used
Agl civils works
car parks works
saw cutting and core works
line marking and rubber removal
radar and ILS projects
interceptor works
scottish and southern works
grass maintenance
fire training
fleet of vans
fleet of JCB 3CX excavators
We operate a fleet of vans, mainly 4m Mercedes and VW models, plus some Transits
We also operate a fleet of JCB 3CX excavators, replacing them every 6 months, averaging 2000 hours for each machine
For Airside of Road civil works we operate Land Rover's 90, 110 and 130 models
repair guaranteed
 
For Airside of Road civil works we operate Land Rover's 90, 110 and 130 models. The Land Rover 130 4 door pickup is our heavyweight, we consider it the best available
Our clients are widely spread, we average 8 - 10 hour roundtrips, so we operate Land Rover Discoverys, Mitsubishi Shoguns and Toyota Jeeps within our fleet - a Discovery covered 53,000 miles in a season
 
Crafco heater extruder applies overband Seal Squeegie system at BAA Edinburgh airport
perfect patch repair
 
Crafco heater extruder applies overband Seal Squeegee system at BAA Edinburgh airport - the only machine of its type in the UK
The Crafco heater extruder applied 600 gallons of overband sealant, the equivalent of 12,000m in 3 nights at BAA Aberdeen airport, between flights. The high output of the machine means less time in operational areas - just what the client wants!
 
Terrex 8 ton excranks
JCB Fast-traks
 
Terrex 8 ton excavator applies the final grade on a pump for the delethalisation programme while 3 Johnstone sweepers worked continuously, 24 hours a day, for 9 months to keep the the airfield FOD free
JCB Fast-traks were used to haul 15,000 tonnes of aggregate to provide pumps on a delethalisation programme. The Fast-traks were chosen by Bar-W, as 20 ton tipper lorries would have been harder on the Runway surface with their double axle drive wheels
 
JCB 3CX excavators
 
2 more JCB 3CX excavators worked continuously, 24 hours a day for 9 months on an AGL project, being replaced after 6 months. Seen here are the latest pair installing AGL blocks
 
 
Bar-W still continued to install a new pit and duct system
 
 
In whiteout conditions, Bar-W still continued to install a new pit and duct system for Alfred McAlpine's at BAA,s airports
 
Cat 312 excavators
Final grading on completion of 2 new Runway Approach lighting systems for BAA
 
We only use Cat 312 excavators for our AGL and Civil works, we consider them to the best for the job. Our drivers find that they are quicker and more flexible for the challenging environment we work in
Final grading on completion of 2 new Runway Approach lighting systems for BAA
 
Installing a new Drainage system
Final grade around an AGL Control box
 
Installing a new Drainage system through the Runway approach
Final grade around an AGL Control box, a new AGL Control System was installed for BAA over a 3 month period, working live around Airside movements
BAR-W-GROUP  Dalcross Industrial Estate  Inverness Airport  Inverness   IV2 7JB   Scotland