Bar-W-Group
home page airport repairs and maintenance Bar-Build Ltd specialist surfacing Bar-W-Contractors contact us contact us
Line Marking and Rubber Removal
Projects
Overband Seal works / Crafco
AGL plant used
Agl civils works
car parks works
saw cutting and core works
line marking and rubber removal
radar and ILS projects
interceptor works
scottish and southern works
grass maintenance
fire training
We operate a fleet of Line Lazers for Runway marking
New Runway side stripe being marked
We operate a fleet of Line Lazers for Runway marking, and offer the post cost effective package for application to markings Airside
New Runway side stripe being marked
The Graco Line Lazers operate a width of 500mm in a single pass
We can paint, on average, all Airside within 5 nights, that is, 2 MO Runways, all Taxiways Stands up to 20 no.
 
The Graco Line Lazers operate a width of 500mm in a single pass
We can paint, on average, all Airside within 5 nights, that is, 2 MO Runways, all Taxiways and Stands.
We also install anti-slip paints for pedestrian crossing points
 
1 metre wide rubber removal being carried out at BAA Edinburgh airport
1 metre wide rubber removal being carried out at BAA Aberdeen airport
 
1 metre wide rubber removal being carried out at BAA Edinburgh airport
1 metre wide rubber removal being carried out at BAA Aberdeen airport
 
As rubber removal continues, our Runway sweepers follow on behind
With our high pressure, low volume water jetting units, all liquid is swept and removed from site in one operation
 
As rubber removal continues, our Runway sweepers follow on behind
With our high pressure, low volume water jetting units, all liquid is swept and removed from site in one operation
 
 
New Runway Ahead markings at holding points for BAA
BAR-W-GROUP  Dalcross Industrial Estate  Inverness Airport  Inverness   IV2 7JB   Scotland
Tel: 0800 085 9031 / 01667 460376  Fax: 01667 460373  email: barwairports@ukonline.co.uk