Saw Cutting (Concrete) & Core
Work
|
|
|
|
|
| Concrete repairs being carried out live on aprons and parking
stands, with only a 2 hour window allowed by ATC and OPS. We carried out a concrete
repair at Edinburgh airport on their stands throughout the day and repaired manhole
surrounds on their main Runway at night |
|
A 2 metre square concrete repair installed.
The repair carries an 8 year guarantee, once completed |
|
|
|
|
| |
| No relief cut needed on our flexible concrete repairs |
|
| Concrete repairs have been installed for the MOD at their
NATO air bases. There, fighter jets are one of the hardest hitting aircraft when
landing. Here, rubber deposits show how our concrete repairs stand up to traffic |
|
| |
|
|
| |
|
A new AGL centre line being installed for BAA
|
|
| Surveying work is carried out inhouse, reports are provided
to the clients for their records |
|
| |
|
|
| |
Concrete repairs carried out.
We completed a 3 year programme for BAA on cracked and sunk concrete panels on
their Taxiways and aprons. There was no need to remove the panels as the sunken
areas were repaired with our flexible concrete system |
|
| Concrete repairs are fully installed and ready for handing
back within 60 minutes. Emergency repairs are executed within 5 minutes |
|
| |
|
|
| |
| Seen here is cutting a chase 30mm wide by 200mm deep from
Runway side edge to the light fitting |
|
| Featuring a double saw blade attachment for crossings, a
single saw cut either side of saw is cut before the excavation is carried out |
|
| |
|
|
| |
|
Final cut before a 30mm duct is installed
|
|
| On completion of sawing, the duct chase was filled with quick-setting
concrete and then a final application of joint sealant. A total of 1500 gallons
of sealant was used C/W a squeegee finish |
|
| |
|
|
| |
| A total of 600 new SR8 pots were installed in a recent AGL
project |
|
|
SR8 pots being installed with jig
|
|
| |
|
|
| |
| 100mm diameter cable ducts were installed at Lead Ons. Our
trenching machine C/W 300mm diameter rock wheel was used to excavate an open trench.
Picture shows full reinstatement, with core ready to receive new AGL filling |
|
| Picture shows our Merc 4m van, fully kitted out for Runway
repairs. The vans are fully kitted out with 28 multi-channel radios so that our
operatives are in contact with ATC, and Operations at all times when Airside.
There is a second radio fitted in each vehicle for back to back communications |
|
| |
 |
|
| |
|
|
| |
 |
| |
|
|
|
|